Twice-weekly briefing — email only.
1. Call to Order
2. Roll Call
3. Approval of Agenda
4. Approval of Minutes
5. Approval of Findings/Conclusions
6. Matters from the Public
7. Staff Communications
7-a. 715 Camino Lejo, Historic Review
8. Old Business
8-a. 219 and 219 A Washington Ave.· 2025-010873-HDRB
8-b. 439 Camino del Monte Sol Lot 1-A· 2025-010495-HDRB
(Paul Duran)
9. New Business
9-a. 1323 Paseo De Peralta· 2025-011226-HDRB
9-b. 925 Canyon Rd.· 2025-011227-HDRB
(Lani McCulley)
9-c. 927 Canyon Rd.· 2025-011228-HDRB
(Lani McCulley)
9-d. 815 Dunlap St.· 2025-011229-HDRB
An exception is requested to 14-5.2(D)(5)(a) for replacing historic windows. (Lani McCulley)
9-e. 456 Camino Don Miguel· 2025-011245-HDRB
Hughes, owners, request approval of a new 529 sq. ft. detached garage structure in the Recent Santa Fe design style to a height of 11’-7” where the maximum allowable height is 15’-8” and new vehicular gate to 6’-0” were the maximum allowable height is 6’-0”. (Paul Duran) (Withdrawn)
9-f. 1020 Camino San Acacio· 2025-011248-HDRB
(Paul Duran) (Withdrawn)
9-g. 412 Camino Don Miguel· 2025-011327-HDRB
(Lani McCulley)
9-h. 127 Duran St.· 2025-011326-HDRB
9-i. 826 Camino del Poniente· 2025-011329-HDRB
Contributing. Martinez Architectural Studio, agent for Larry Colton and John McCoy, owners, requests changes to the previously approved case 2024-007775-HDRB, including the decrease and relocation of the garage, relocating the yard wall gate, enclosing a 49 sq. ft. portion of the...
9-j. 401 E. Palace Ave.· 2025-011353-HDRB
Palace Ave., Downtown & Eastside Historic District, contributing, Andrew Lyons agent for George Abrams, LLC, owner, proposes to remodel exterior of residence and garage, build a 3’-6” yardwall. Exceptions are requested to 14-5.2 (D)(5)(b) for removing historic material, replacing...
9-k. 515 Paseo de Peralta· 2025-011354-HDRB
(Amanda Romero)
9-l. 527 Agua Fria St. units 1, 2, & 3· 2025-011230-HDRB
Exceptions are requested to 14-5-2(D)(5)(a)(i)(ii)(iii) for replacement of windows on primary facades, 14-5-2(D)(3)(a) for raising the roof of a significant structure, 14-5-2(D)(2)(c) placing an addition on a primary façade, 14-5-2(D)(3)(b) installing a chimney on a significant s...
10. Discussion Items
11. Matters from the Board
12. Next Meeting:
12-a. November 18
13. Adjourn