Solid Waste Management Agency Joint Powers Board Meeting — Thu, Nov 19, 2026 · VII.A Operational Update: Installation of New Outbound Scale and Removal of Existing Unit at Buckman Road Recycling and Transfer Station
MEMORANDUM To: SFSWMA Joint Powers Board From: Randall Kippenbrock, P.E., Executive Director RLK Date: November 16, 2026 Operational Update: Installation of New Outbound Scale and Removal of Existing Unit at Buckman Road Recycling and Transfer Station On September 19, 2026, the Board approved a $208,382.48 contract (No. 2026-03-R1265-ALL) with CES/Anissa Construction to remove the existing scale and install a new one at the Buckman Road Recycling and Transfer Station (BuRRT). Installation is scheduled over a 10-day period from Monday, January 11, through Wednesday, January 20, 2027. The project consists of four phases: site preparation, concrete work, scale installation, and final calibration. OPERATIONAL & TRAFFIC IMPACTS Single-Scale Operations: All scale ticketing transactions will take place on the inbound scale, supported by dedicated traffic controllers. Traffic Flow Mitigation: The Agency will apply flat rates to small loads during this window to minimize reweighing and prevent bottlenecks. PROJECT SCHEDULE Phase 1: Preparation and Delivery (January 11 – January 13, 2027) Monday, January 11: Anissa Construction mobilizes, holds a morning kickoff meeting, clears the site, cuts existing anchors, and receives the rebar delivery. Tuesday, January 12: A crane mobilizes to remove the old scale; crews clean the scale pit and prepare for new concrete forms. Wednesday, January 13: Crews form concrete piers at the bottom of the scale pit and construct a wall at the former mechanical scale location. Phase 2: Concrete Work (January 14 – January 18, 2027) Thursday, January 14: Crews pour concrete into the prepared forms. Friday, January 15: Crews cut up the old scale for disposal (schedule includes built-in flexibility for potential inclement weather). Saturday – Sunday, January 16 – 17: Crews strip concrete forms on Saturday, followed by a Sunday weather/curing buffer while the project area remains closed. Monday, January 18: While BuRRT is closed to the public for Martin Luther King Jr. Day, crews finish stripping forms, backfill the wall, and clear all debris ahead of Rusty’s Weigh’s mobilization. Phase 3: Scale Installation (January 19, 2027) Tuesday, January 19: Rusty’s Weigh crews set the new scale in place, anchor the base plates, and install the load cells. Phase 4: Scale Testing and Calibration (January 20, 2027) Wednesday, January 20: Rusty’s Weigh crews wire, test, and calibrate the new scale. The project concludes with a final inspection, an Agency walkthrough, completion of handover documentation, and demobilization of Anissa Construction and Rusty’s Weigh. BuRRT Scale Installation Project Schedule — January 11 to January 20, 2027 Date Day Phase Key Milestones & Tasks January 11, 2027 Monday Phase 1: Preparation and Delivery Anissa Construction mobilization; Site prep & kickoff: Hold a morning kickoff meeting, confirm site readiness, and clear the installation area. Cut anchors and prep the scale for removal. Rebar delivery. January 12, 2027 Tuesday Phase 1: Preparation and Delivery Crane mobilization. Remove scale, clean the scale pit, and prep the scale for new concrete forms. January 13, 2027 Wednesday Phase 1: Preparation and Delivery Form concrete piers at the bottom of the scale pit; form a wall at the former mechanical scale. January 14, 2027 Thursday Phase 2: Concrete - Day 1 Place concrete in forms. January 15, 2027 Friday Phase 2: Concrete - Day 2 Cut the old scale. Allow for a bad weather day January 16, 2027 Saturday Phase 2: Concrete - Day 3 Strip forms. January 17, 2027 Sunday Phase 2: Concrete - Day 4 Weekend Buffer: Keep the project area closed. January 18, 2027 Monday Phase 2: Concrete - Day 5 Strip forms; backfill the wall with select fill at the former mechanical scale. Clean the scale area and remove debris prior to Rusty's Weigh mobilization. Note: BuRRT is closed for MLK Day. January 19, 2027 Tuesday Phase 3: Concrete Day - 6 and Scale Installation Set scale, anchor base plates, install load cells January 20, 2027 Wednesday Phase 4: Concrete Day - 7 and Scale Testing and Calibration Wire, test, and calibrate the scale. Final inspection and sign-off. Conduct a walkthrough with the Agency and complete handover documentation. Anissa Construction and Rusty's Weigh demobilization. M:\Memo\1116.1