Regular Governing Body Meeting - Second Wednesday — Wed, Oct 14, 2026 · 20A. CONSIDERATION OF BILL 2026-19. ADOPTION OF ORDINANCE 2026-__. A Bill Rezoning an Approximately +/- 1.695-Acre Lot at 1202 West Alameda Street from C-2 PUD (General Commercial Planned Unit Development), with an Existing Permitted Use Limited to a “Feed Bin Store”, to C-2 PUD (General Commercial Planned Unit Development) with Expanded Permitted Uses to Include: Residential; Retail; Food and Beverages; Office; Woodshop (Light Assembly and Manufacturing); Storage; and Arts and Crafts Studio, Gallery or School; and Concurrent Approval of a Final Development Plan for the Property Pursuant to SFCC Section 14-4.1.A.3.III (Case Nos. 2026-12047 and 2026-12048. (Natalie Cauley, Assistant City Attorney; nscauley@santafenm.gov, Claudia Kath, Planner Senior; cmkath@santafenm.gov) Committee Review: Governing Body: 10/14/2026
Item #26-0411 09/30/2026 Attachment A-1 REVISED August 6, 2026 Table of Conditions of Approval and Technical Corrections A-1: Table of Conditions of Approval A-2: Table of Technical Corrections A-3: Development Review Team Compiled Comments • Land Use • Fire Protection • Parks & Open Space • Water Division • Water Resources • Wastewater Division • Environmental Services Land Use Department Case #: 2026-12047 & 12048 Planning Commission Staff Report 1202 W. Alameda St. Case 2026-12047 & 12048 – 1202 W. Alameda St. Page 2 of 4 Planning Commission August 6, 2026, Meeting Attachment A-1 TABLE OF CONDITIONS OF APPROVAL Department To be completed by: A. Case #2026-12047: The Planning Commission recommended “to the Governing Body that they approve the rezone request subject to the Conditions of Approval and Technical Corrections as outlined in the Staff Report with the additional condition that the Applicant be limited to two stories.” Planning Commission Prior to Recordation B. Case #2026-12048: The Planning Commission recommended “the Governing Body approve the Development Plan subject to the Conditions of Approval and Technical Corrections outlined in the Staff Report with the added condition of limiting the development to two stories.” Planning Commission Prior to Recordation 1 Approval of the final Development Plan (Case #2026-12048) by the Planning Commission shall be considered preliminary until the Governing Body approves the new PUD proposed in Case #2026-12047. Land Use Prior to Governing Body 2 Provide a copy of the meeting notes from the ENN Land Use Prior to Planning Commission Hearing 3 Provide explanations on how each architectural point criterion is met by this project Land Use Prior to Planning Commission Hearing 4 New lot must be addressed Land Use Prior to Lot Split Recordation 5 Architectural elevations should be in color with stucco color identified for digital DRT review. Land Use Prior to Recordation 6 Architectural elevations should be in black and white (line work) for recording. Land Use Prior to Recordation 7 Condition to Case #2027-12047: In alignment with the purpose of SFCC Section 14-7.5.G, “EV Charging Space Requirements,” staff requires the following EV charging spaces on any new development of the premise of this site established via the PUD. New developments that require 25 or more parking spaces must provide a minimum of 10% EV-capable parking spaces and 3% EV-installed spaces, in alignment with the “Retail and Personal Service” line of SFCC Table 7-6. Land Use Prior to Planning Commission Hearing Land Use Department Case #: 2026-12047 & 12048 Planning Commission Staff Report 1202 W. Alameda St. Case 2026-12047 & 12048 – 1202 W. Alameda St. Page 3 of 4 Planning Commission August 6, 2026, Meeting 8 Shall comply with the most currently adopted International Fire Code (IFC) and adopted city ordinances upon building permit approval. Fire Prior to Building Permit 9 DP-100: Notarized Stormwater Agreement should include inspection and maintenance language also. Public Works / Parks & Open Space Prior to Planning Commission Hearing 10 Ponds drain parking lot runoff directly to river without pretreatment. This will require a stormwater quality volume calculation to determine volume of water that must be managed onsite, regardless of predevelopment hydrology controls. See volume calculation. Public Works / Parks & Open Space Prior to Planning Commission Hearing 11 Culverts to river require outfall protection and energy dissipation to avoid erosion. Public Works / Parks & Open Space Prior to Planning Commission Hearing 12 Dumpster/Grease Traps/Recycling: these facilities are at back of property along river; developers should make sure this has a lip and fencing so that any liquids or floatables are contained to this area and do not trespass to river corridor. Public Works / Parks & Open Space Prior to Planning Commission Hearing 13 Developers should refer to City’s preferred tree and plant list as this is near the SF River; developers should avoid aggressive/invasive ornamentals that may establish within river corridor. Public Works / Parks & Open Space Prior to Planning Commission Hearing 14 An approved Agreement to Construct and Dedicate (ACD) will be required for new fire and domestic water services Water Division Prior to Public Hearing 15 An approved Water Plan will be required for all new public water infrastructure and fire services. Water Division Prior to Public Hearing 16 A separate irrigation meter will be required if the total landscaped area is 1,000 square feet or greater. An approved backflow prevention device shall also be installed beyond the meter on any new irrigation service Water Division At the time of Development 17 Any re-grading of site over existing water mains shall maintain a minimum of 4 feet of cover and not exceed 5 feet of cover. Depth of existing main to be adjusted to maintain a minimum of 4 feet of cover and not exceed 5 feet of cover if site grading impacts these depth requirements. Water Division At the time of Development 18 An approved Development Water Budget including a 9.8% contingency per SFCC 14-8.13(E)(1) will be required. A technical evaluation request for a Development Water Budget needs to be submitted to the City Water Division for review. Water Resources Prior to Planning Commission Hearing Land Use Department Case #: 2026-12047 & 12048 Planning Commission Staff Report 1202 W. Alameda St. Case 2026-12047 & 12048 – 1202 W. Alameda St. Page 4 of 4 Planning Commission August 6, 2026, Meeting 19 An Agreement to Construct and Dedicate (ACD) from the Water Division will be required for all new public water infrastructure or fire services. An approved Development Water Budget, including Landscape Irrigation Budget and a 9.8% Contingency is required prior to processing the ACD. Water Resources Prior to Building Permit 20 Each lot shall be served by separate water service at the time of development. Water Resources Prior to Building Permit 21 An agreement for metered service (AMS) will be required to install new services, including water offset fees Water Resources Prior to Building Permit 22 If a sewer service connection is proposed at Lot 1-A-2, a utility easement shall be granted in favor of Lot 1-A-1 to allow for proper access and maintenance. Wastewater Prior to Planning Commission Hearing 23 If the sewer service is intended to be shared between properties, a recorded Shared Sewer Agreement shall be filed with the County and a copy provided to the Wastewater Management Division for recordkeeping. Wastewater Prior to Building Permit Approval 24 Please confirm whether all feasible options for connecting to the public sewer have been fully evaluated. Additionally, identify where the existing structure on Lot 1-A-1 was previously connected to the sewer system. Wastewater Prior to Building Permit Approval 25 Existing trash enclosure was not built to code. Applicant shall redesign to bring the enclosure up to code, including openings be 12 ft wide when open. (SFCC 21-4.6, Exhibit A.1 or A.2) Environmental Services Prior to Planning Commission Hearing 26 All development plan, infrastructure, and architectural plan sheets shall be updated to show EV charging spaces Land Use Prior to Recordation Signature:Email:xivigil@santafenm.gov 26-0411 Boyd and Allister, LLC Case #2026-12047 Final Audit Report 2026-09-30 Created: 2026-09-30 By: XAVIER VIGIL (xivigil@santafenm.gov) Status: Signed Transaction ID: CBJCHBCAABAAM_BnQPmrZfxmSEzKYxw-xPRbOmJaOBFO Documents: 26-0411 Boyd and Allister, LLC2026-12047 - FOFCOL - signed.pdf (8 pages) Number of Documents: 1 Document page count: 9 Number of supporting files: 0 Supporting files page count: 0 "26-0411 Boyd and Allister, LLC Case #2026-12047" History Document created by XAVIER VIGIL (xivigil@santafenm.gov) 2026-09-30 - 8:53:35 PM GMT- IP address: 63.232.20.2 Document emailed to XAVIER VIGIL (xivigil@santafenm.gov) for signature 2026-09-30 - 8:54:32 PM GMT Document e-signed by XAVIER VIGIL (xivigil@santafenm.gov) Signature Date: 2026-09-30 - 8:54:46 PM GMT - Time Source: server- IP address: 63.232.20.2 - Signature Appearance Selected: IMAGE Document emailed to GERALYN CARDENAS (gfcardenas@santafenm.gov) for signature 2026-09-30 - 8:54:49 PM GMT Email viewed by GERALYN CARDENAS (gfcardenas@santafenm.gov) 2026-09-30 - 9:25:37 PM GMT- IP address: 104.47.64.254 Document e-signed by GERALYN CARDENAS (gfcardenas@santafenm.gov) Signature Date: 2026-09-30 - 9:26:30 PM GMT - Time Source: server- IP address: 63.232.20.2 - Signature Appearance Selected: IMAGE Agreement completed. 2026-09-30 - 9:26:30 PM GMT