Historic Districts Review Board Meeting — Tue, Sep 22, 2026 · 9.a 2026-013106-HDRB. 320 Camino Delora. Downtown & Eastside Historic District. Non-contributing. Martinez Architecture Studio, agent for Mary Hardin and Dan Cullen, owners, proposes to construct 527 sq. ft. of additions to a guest house. (Lani McCulley, LJMcCulley@santafenm.gov)
\\Frank\Projects\2601 - Hardin\Documents\Historic\Old\2601 - Hardin HDRB remodel letter.docx Last printed 5/5/2026 11:05:00 AM Hardin Residence 320 Camino Delora May 11, 2026 Downtown/Eastside Historic District - Contributing EXISTING CONDITIONS: A lot consisting of an adobe main house built in 1937 which has been altered over time exists. The Casita was built later as a garage and was later converted into a guest house. PROPOSED CONSTRUCTION: We propose to build a 12’ – 9” tall addition to the casita; 341 sq ft heated living room addition, 65 sq ft storage and 121 sq ft portal to an existing 581 sq ft guest house, while leaving the 874 sq ft main house unchanged. Changes will not be visible from the street and the height of the addition is lower than the existing main house. Main house - East side: NO CHANGE Main house - North side: NO CHANGE Main house - West side: NO CHANGE Main house - South side: NO CHANGE Casita - East side: • Add heated addition and portal. 12’ – 9”, tall 341 sq ft heated addition and 121 sq ft portal. Casita - North side: • Add heated addition and storage. 12’ – 9”, tall 341 sq ft heated addition, and 65 sq ft storage Casita - West side: • Add heated addition and storage. 12’ – 9”, tall 341 sq ft heated addition, and 65 sq ft storage. Casita - South side: • Parapet above existing roof for the addition. Sincerely, Richard Martinez Martinez Architecture Studio PC M A R T I N E Z S T U D I O P C A R C H I T E C T U R E 1 5 2 4 P A S E O D E P E R A L T A S A N T A F E 5 0 5 - 9 8 9 - 4 9 5 8 s t u d i o @ m a r t i n e z a r c h . c o m HARDIN ADDITION TO GUEST HOUSE 320 CAMINO DELORA SANTA FE, NEW MEXICO main house Street View MAY 11, 2026 M A R T I N E Z S T U D I O P C A R C H I T E C T U R E 1 5 2 4 P A S E O D E P E R A L T A S A N T A F E 5 0 5 - 9 8 9 - 4 9 5 8 s t u d i o @ m a r t i n e z a r c h . c o m HARDIN ADDITION TO GUEST HOUSE 320 CAMINO DELORA SANTA FE, NEW MEXICO main house east ELEVATIO MAY 11, 2026 M A R T I N E Z S T U D I O P C A R C H I T E C T U R E 1 5 2 4 P A S E O D E P E R A L T A S A N T A F E 5 0 5 - 9 8 9 - 4 9 5 8 s t u d i o @ m a r t i n e z a r c h . c o m HARDIN ADDITION TO GUEST HOUSE 320 CAMINO DELORA SANTA FE, NEW MEXICO main house north ELEVATIO MAY 11, 2026 M A R T I N E Z S T U D I O P C A R C H I T E C T U R E 1 5 2 4 P A S E O D E P E R A L T A S A N T A F E 5 0 5 - 9 8 9 - 4 9 5 8 s t u d i o @ m a r t i n e z a r c h . c o m HARDIN ADDITION TO GUEST HOUSE 320 CAMINO DELORA SANTA FE, NEW MEXICO main house west ELEVATIO MAY 11, 2026 M A R T I N E Z S T U D I O P C A R C H I T E C T U R E 1 5 2 4 P A S E O D E P E R A L T A S A N T A F E 5 0 5 - 9 8 9 - 4 9 5 8 s t u d i o @ m a r t i n e z a r c h . c o m HARDIN ADDITION TO GUEST HOUSE 320 CAMINO DELORA SANTA FE, NEW MEXICO main house south ELEVATIO MAY 11, 2026 M A R T I N E Z S T U D I O P C A R C H I T E C T U R E 1 5 2 4 P A S E O D E P E R A L T A S A N T A F E 5 0 5 - 9 8 9 - 4 9 5 8 s t u d i o @ m a r t i n e z a r c h . c o m HARDIN ADDITION TO GUEST HOUSE 320 CAMINO DELORA SANTA FE, NEW MEXICO GUEST house EAST ELEVATIO MAY 11, 2026 M A R T I N E Z S T U D I O P C A R C H I T E C T U R E 1 5 2 4 P A S E O D E P E R A L T A S A N T A F E 5 0 5 - 9 8 9 - 4 9 5 8 s t u d i o @ m a r t i n e z a r c h . c o m HARDIN ADDITION TO GUEST HOUSE 320 CAMINO DELORA SANTA FE, NEW MEXICO GUEST house NORTH ELEVATI MAY 11, 2026 M A R T I N E Z S T U D I O P C A R C H I T E C T U R E 1 5 2 4 P A S E O D E P E R A L T A S A N T A F E 5 0 5 - 9 8 9 - 4 9 5 8 s t u d i o @ m a r t i n e z a r c h . c o m HARDIN ADDITION TO GUEST HOUSE 320 CAMINO DELORA SANTA FE, NEW MEXICO GUEST house WEST ELEVATIO MAY 11, 2026 M A R T I N E Z S T U D I O P C A R C H I T E C T U R E 1 5 2 4 P A S E O D E P E R A L T A S A N T A F E 5 0 5 - 9 8 9 - 4 9 5 8 s t u d i o @ m a r t i n e z a r c h . c o m HARDIN ADDITION TO GUEST HOUSE 320 CAMINO DELORA SANTA FE, NEW MEXICO GUEST house SOUTH ELEVATIO MAY 11, 2026 New 341 sq.ft. Heated Addition New 121 sq.ft. Portal New 65 sq.ft. Storage \\Frank\Projects\2601 - Hardin\Documents\Historic\2601 - Hardin finishes 250912.docx Last printed 5/5/2026 11:05:00 AM Hardin Residence 320 Camino Delora May 11, 2026 Exterior Finishes Stucco – El Rey “Buckskin” Windows – “Colonial White” To match existing To match existing Exterior wood posts & lintels – Wood stain Portals & steps – Brick To match existing To match existing WASHER DRYER REF living room entry bath bedroom kitchen LAUNDRY dining room ELEC. METER UP bedroom work shop kitchen bath STORAGE 115 LIVING ROOM 115 STORAGE 115 PORTAL 115 86 X 30 MURAL 14'-4 1 2 " 17'-6 1 2 " 2' X 8' SKYLIGHT NEW OPENING W/ NEW BEAM 538 GUEST HOUSE 974 HOUSE 340 ADDITION 121 PORTAL 65 STORAGE bedroom living room kitchen bath WASHER DRYER REF living room entry bath bedroom kitchen LAUNDRY dining room ELEC. METER UP 538 GUEST HOUSE 974 HOUSE COVER SHEET & PROJECT DATA SET # A ADDITION TO320 CAMINO DELORA, GUEST HOUS PROJECT DATA SANTA FE, NEW MEXICO OWNERS - MARY HARDIN & DAN CULLEN DRAWING INDEX MARTINEZ ARCHITECTURE STUDIO P.C. 1524 PASEO DE PERALTA, SANTA FE VICINITY MAP AREA DIAGRAM DIRECTIONS TO SITE: THIS PROJECT SITS CORNER OF CAMINO DELORA AND CRISTO REY ST. 35°40'42.3"N 105°55'06.1"W M3HJ+9M6 SANTA FE, NEW MEXICO M A R T I N E Z S T U D I O P C A R C H I T E C T U R E 1 5 2 4 P A S E O D E P E R A L T A S A N T A F E 5 0 5 - 9 8 9 - 4 9 5 8 s t u d i o @ m a r t i n e z a r c h . c o m 0.1NORTH DESIGN PROFESSIONALS ARCHITECT: RICHARD MARTINEZ MARTINEZ ARCHITECTURE STUDIO P.C. P.O. BOX 925 SANTA FE, NM, 87504 (505) 989-4958 GENERAL NOTES 1. THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND REPORT DISCREPANCIES TO THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. 2. UNLESS NOTED OTHERWISE, ALL WORK AND MATERIALS SHALL BE PROVIDED AND INSTALLED BY THE CONTRACTOR. 3. ALL CONSTRUCTION SHALL COMPLY WITH THE MOST RECENTLY ADOPTED APPLICABLE CODES: 2021 NM COMMERCIAL BUILDING CODE (2021 IBC AS AMENDED), 2021 NM RESIDENTIAL BUILDING CODE (2021 IRC AS AMENDED), 2021 NM EXISTING BUILDING CODE (2021 IEBC AS AMENDED), 2021 NM PLUMBING CODE (2021 UPC AS AMENDED), 2021 NM MECHANICAL CODE (2021 UMC AS AMENDED), 2020 NM ELECTRICAL CODE (2020 NEC AS AMENDED), 2012 NM ELECTRICAL SAFETY CODE (2012 NESC AS AMENDED), 2021 NM EARTHEN BUILDING MATERIALS CODE, 2021 NM HISTORIC EARTHEN BUILDINGS CODE, 2009 NM NON-LOAD BEARING BALED STRAW CONSTRUCTION BUILDING CODE, 2021 NM ENERGY CONSERVATION CODE (2021 IECC AS AMENDED), 2012 NM SWIMMING POOL, SPA AND HOT TUB CODE (2012 USPSHTC AS AMENDED), 2012 NM SOLAR ENERGY CODE (2012 USEC AS AMENDED), 2021 INTERNATIONAL FIRE CODE AND CITY OF SANTA FE IFC AMENDMENTS, NEW MEXICO ADMINISTRATIVE CODE (NMAC): 14.5.1 GENERAL PROVISIONS; 14.5.2 PERMITS; 14.5.3 INSPECTIONS, 2017 ICC A117.1-2017 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES. CODE COMPLIANCE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 4. ALL DRAWINGS ARE THE PROPERTY OF MARTINEZ ARCHITECTURE STUDIO P.C. AND MUST BE RETURNED AT THE COMPLETION OF WORK. THEY SHALL NOT BE REPRODUCED, MODIFIED OR REVISED IN ANY WAY WITHOUT THE WRITTEN CONSENT FROM, AND PROPER COMPENSATION TO THE ARCHITECT. THE ARCHITECT SHALL PROTECT HIS RIGHT AND BE REIMBURSED FOR ALL LEGAL AND COURT COST ETC., FOR ANY NECESSARY PROTECTION OF THE DRAWINGS. SUBMISSION OF THESE DRAWINGS TO ANY PUBLIC BODY FOR ANY USE DOES NOT RELEASE IN ANY WAY THE COPYRIGHT AND OWNERSHIP OF DRAWINGS/SPECIFICATIONS PROVISIONS LISTED HEREIN. PROJECT LOCATION A-0.1 COVER SHEET & PROJECT DATA A-1.0 EXISTING & PROPOSED SITE PLAN A-2.0 EXISTING & PROPOSED GUEST HOUSE FLOOR PLANS A-3.0 NORTH & EAST ELEVATIONS - GUEST HOUSE A-3.1 SOUTH & WEST ELEVATIONS - GUEST HOUSE A-4.0 EXISTING MAIN HOUSE FLOOR PLAN A-5.0 EXISTING ELEVATIONS - MAIN HOUSE EXISTING PROPOSED 1/16" = 1'-0" 1/16" = 1'-0" SCOPE OF WORK: ADD A 341 SQ.FT. HEATED ADDITION, 65 SQ.FT. STORAGE AND 121 SQ.FT. PORTAL TO AN EXISTING 581 SQ.FT. GUEST HOUSE. BUILDING TYPE: RESIDENCE CONSTRUCTION TYPE: V-B MAX BUILDING HEIGHT: 13'-4" 12'-9" PROPOSED NET AREAS: EXISTING MAIN HOUSE: HEATED / TOTAL ROOF AREA: GUEST HOUSE: HEATED / TOTAL ROOFED AREA: TOTAL EXISTING ROOFED AREA ON LOT: NET AREAS : PROPOSED GUEST HOUSE: ADDITION: STORAGE: PORTAL: TOTAL ADDED ROOFED AREA: TOTAL ADDED ROOFED AREA ON LOT: TOTAL PROPOSED ROOFED ON LOT: 974 s.f. 581 s.f. 581 s.f. 1,555 s.f. LOT AREA: 6,477 s.f. LOT COVERAGE: EXISTING = 24.0% PROPOSED = 32.14% UTILITY DATA: GAS : NATURAL GAS ELECTRIC : UNDERGROUND SEWER : MUNICIPAL SEWER WATER : MUNICIPAL WATER ZONING : RC5 SPECIAL DISTRICTS: DOWNTOWN AND EASTSIDE PARKING REQUIREMENTS: 3 SPACES REQUIRED AND PROVIDED 527 s.f. 527 s.f. 2,082 s.f. APRIL 29, 2026 HARDIN ADDITION TO GUEST HOUSE 3 2 0 C A M I N O D E L O R AS A NT A F E , NE W ME X I C O HARDIN RENOVATION 2518 974 s.f. 341 s.f. 65 s.f. 121 s.f. P:\2601 - Hardin\CURRENT\2601 - Hardin_260422.dwg, CoverSheet, 4/29/2026 10:18:59 AM, 1:1 45.22'N 15d 14' 45" W 147.57'N 83d 31' 54" W 49.23'S 18d 18' 37" E 46.09'S 79d 52' 56" W 147.57'N 83d 31' 54" W CAMINO DELORA STORAGE SHED 5'-0" SETBACK 7'-0" SETBACK 5'-0" SETBACK 15'-0" SETBACK 22'-6" 11'-4" 88'-11" 16'-3" EXISTING (3) THREE PARKING SPACES ELEC. METER UP PORTAL 115 2' X 8' SKYLIGHT EXISTING ENCROACHMENT 45.22'N 15d 14' 45" W 147.57'N 83d 31' 54" W 49.23'S 18d 18' 37" E 46.09'S 79d 52' 56" W 147.57'N 83d 31' 54" W CAMINO DELORA STORAGE SHED EXISTING ENCROACHMENT EXISTING (3) THREE PARKING SPACES ELEC. METER UP SCALE:1/8"=1'-0" PROPOSED SITE PLAN A 1.0 1 EXISTING AND PROPOSED SITE PLANS SET # 1.0 A HARDIN RENOVATION 2518 APRIL 29, 2026 M A R T I N E Z S T U D I O P C 1 5 2 4 P A S E O D E P E R A L T A S A N T A F E A R C H I T E C T U R E 5 0 5 - 9 8 9 - 4 9 5 8 s t u d i o @ m a r t i n e z a r c h . c o m NORTH SCALE:1/8"=1'-0" EXISTING SITE PLAN A 1.0 1 NORTH HARDIN ADDITION TO GUEST HOUSE 3 2 0 C A M I N O D E L O R AS A NT A F E , NE W ME X I C O P:\2601 - Hardin\CURRENT\2601 - Hardin_260422.dwg, 1.0 SitePlan, 4/29/2026 10:19:39 AM, 1:1 bedroom work shop kitchen bath STORAGE 115 LIVING ROOM 115 STORAGE 115 PORTAL 115 86 X 30 MURAL14'-41 2" 17'-61 2" 2' X 8' SKYLIGHT NEW OPENING W/ NEW BEAM cond. unit bedroom living room kitchen bath PROPOSED AND PROPOSED GUEST HOUSE FLOOR PLANS SET # 2.0 A HARDIN RENOVATION 2518 APRIL 29, 2026 M A R T I N E Z S T U D I O P C 1 5 2 4 P A S E O D E P E R A L T A S A N T A F E A R C H I T E C T U R E 5 0 5 - 9 8 9 - 4 9 5 8 s t u d i o @ m a r t i n e z a r c h . c o m SCALE:1/4"=1'-0" PROP0SED GUEST FLOOR PLAN A 2.1 2 SCALE:1/4"=1'-0" EXISTING GUEST HOUSE FLOOR PLAN A 2.1 1 HARDIN ADDITION TO GUEST HOUSE 3 2 0 C A M I N O D E L O R AS A NT A F E , NE W ME X I C O 12'-9" EXISTING AND PROPOSED GUEST HOUSE ELEVATIONS SET # 3.0 A HARDIN RENOVATION 2518 APRIL 29, 2026 M A R T I N E Z S T U D I O P C 1 5 2 4 P A S E O D E P E R A L T A S A N T A F E A R C H I T E C T U R E 5 0 5 - 9 8 9 - 4 9 5 8 s t u d i o @ m a r t i n e z a r c h . c o m SCALE:1/4"=1'-0" PROP0SED EAST ELEVATION A 1.0 3 SCALE:1/4"=1'-0" PROP0SED NORTH ELEVATION A 1.0 4 SCALE:1/4"=1'-0" EXISTING EAST ELEVATION A 1.0 1 SCALE:1/4"=1'-0" EXISTING NORTH ELEVATION A 1.0 2 HARDIN ADDITION TO GUEST HOUSE 3 2 0 C A M I N O D E L O R AS A NT A F E , NE W ME X I C O P:\2601 - Hardin\CURRENT\2601 - Hardin_260422.dwg, 3.0 New_Elevations, 4/29/2026 10:19:30 AM, 1:1 EXISTING AND PROPOSED GUEST HOUSE ELEVATIONS SET # 3.1 A HARDIN RENOVATION 2518 APRIL 29, 2026 M A R T I N E Z S T U D I O P C 1 5 2 4 P A S E O D E P E R A L T A S A N T A F E A R C H I T E C T U R E 5 0 5 - 9 8 9 - 4 9 5 8 s t u d i o @ m a r t i n e z a r c h . c o m SCALE:1/4"=1'-0" PROP0SED SOUTH ELEVATION A 1.0 3 SCALE:1/4"=1'-0" PROP0SED WEST ELEVATION A 1.0 4 SCALE:1/4"=1'-0" EXISTING SOUTH ELEVATION A 1.0 1 SCALE:1/4"=1'-0" EXISTING WEST ELEVATION A 1.0 2 HARDIN ADDITION TO GUEST HOUSE 3 2 0 C A M I N O D E L O R AS A NT A F E , NE W ME X I C O P:\2601 - Hardin\CURRENT\2601 - Hardin_260422.dwg, 3.1 New_Elevations, 4/29/2026 10:19:58 AM, 1:1 WASHER DRYER REF living room entry bath bedroom kitchen LAUNDRY dining room ELEC. METER UP EXISTING MAIN HOUSE FLOOR PLAN SET # 4.0 A HARDIN RENOVATION 2518 APRIL 29, 2026 M A R T I N E Z S T U D I O P C 1 5 2 4 P A S E O D E P E R A L T A S A N T A F E A R C H I T E C T U R E 5 0 5 - 9 8 9 - 4 9 5 8 s t u d i o @ m a r t i n e z a r c h . c o m SCALE:1/4"=1'-0" EXISTING MAIN HOUSE FLOOR PLAN A 2.0 1 HARDIN ADDITION TO GUEST HOUSE 3 2 0 C A M I N O D E L O R AS A NT A F E , NE W ME X I C O P:\2601 - Hardin\CURRENT\2601 - Hardin_260422.dwg, 4.0 Plan_House, 4/29/2026 10:19:47 AM, 1:1 13'-4" EXISTING MAIN HOUSE ELEVATIONS SET # 5.0 A HARDIN RENOVATION 2518 APRIL 29, 2026 M A R T I N E Z S T U D I O P C 1 5 2 4 P A S E O D E P E R A L T A S A N T A F E A R C H I T E C T U R E 5 0 5 - 9 8 9 - 4 9 5 8 s t u d i o @ m a r t i n e z a r c h . c o m SCALE:1/4"=1'-0" EXISTING EAST ELEVATION A 5.0 1 SCALE:1/4"=1'-0" EXISTING SOUTH ELEVATION A 5.0 2 SCALE:1/4"=1'-0" EXISTING NORTH ELEVATION A 5.0 3 SCALE:1/4"=1'-0" EXISTING WEST ELEVATION A 5.0 4 HARDIN ADDITION TO GUEST HOUSE 3 2 0 C A M I N O D E L O R AS A NT A F E , NE W ME X I C O P:\2601 - Hardin\CURRENT\2601 - Hardin_260422.dwg, 5.0 Elevations _House, 4/29/2026 10:19:10 AM, 1:1