Regular Governing Body Meeting - Second Wednesday — Wed, Sep 9, 2026 · 9.p CONSIDERATION OF RESOLUTION NO. 2026-____. (Councilor Jamie Cassutt and Mayor Michael Garcia) A Resolution Approving the City of Santa Fe’s Participation in the New Mexico Department of Transportation’s Local Government Road Fund Program for the Henry Lynch Road Reconstruction Project by Entering into Cooperative Grant Agreement, Control Number L500665. (Romella Glorioso-Moss, Complete Streets Capital Projects Manager; rsglorioso-moss@santafenm.gov) Committee Review: Governing Body (Introduced): 08/26/2026 Public Works and Utilities Committee: 08/31/2026 Finance Committee: 09/08/2026 Governing Body: 09/09/2026
Memorandum Date: August 7, 2026 To: Governing Body, Public Works and Utilities Committee, Finance Committee From: Romella Glorioso-Moss, Complete Streets Capital Projects Manager Via: Sam Burnett, Public Work Department Director RE: Resolution Approving Participation in the New Mexico Department of Transportation Local Government Road Fund Program for the Henry Lynch Road Reconstruction Project (Phase A) EXECUTIVE SUMMARY: The attached resolution requests approval for the City of Santa Fe to participate in the New Mexico Department of Transportation (NMDOT) Local Government Road Fund (LGRF) Program for Fiscal Year 2027. Approval authorizes the City to enter into a Cooperative Agreement with NMDOT for Project Control Number L500665 to construct Phase A of the Henry Lynch Road Reconstruction Project. The total estimated project cost is $423,475, with 75% ($317,606) funded by NMDOT and the required 25% local match ($105,869) provided by the City. BACKGROUND: Henry Lynch Road serves as an important collector roadway connecting residential neighborhoods, commercial areas, and employment centers in western Santa Fe. The existing roadway lacks critical multimodal infrastructure, including continuous sidewalks, dedicated bicycle facilities, adequate drainage, and modern intersection improvements. The corridor has experienced increasing traffic volumes as surrounding areas continue to develop, creating the need for a safer and more efficient transportation facility. The Henry Lynch Road Reconstruction Project is a phased capital improvement project designed to modernize the corridor and improve safety for motorists, bicyclists, and pedestrians. Phase A focuses on improvements between La Paz Lane and Agua Fria Street, including construction of a modern roundabout at the Henry Lynch Road/Agua Fria Street intersection. The project includes: • Construction of two 10-foot travel lanes; • Construction of ADA-compliant sidewalks on both sides of the roadway; • Construction of separated bicycle lanes; • Installation of curb and gutter; • Stormwater drainage improvements designed to reduce flooding and improve roadway resilience; and • Construction of a modern roundabout at the intersection of Henry Lynch Road and Agua Fria Street. The project supports the City's Complete Streets policies by improving accessibility and providing safe accommodations for all roadway users. It also advances the City's transportation, safety, and sustainability goals by creating a corridor that supports walking, bicycling, transit access, and efficient vehicle travel. The New Mexico Department of Transportation has awarded funding through the Local Government Road Fund Program to assist with construction of Phase A. Under the Cooperative Agreement, NMDOT will provide $317,606 (75%), while the City will provide the required local match of $105,869 (25%). The City will also be responsible for any project costs that exceed the estimated project budget. Approval of the attached resolution will authorize the City to participate in the Fiscal Year 2027 Local Government Road Fund Program, execute the Cooperative Agreement with NMDOT, and proceed with implementation of Phase A of the Henry Lynch Road Reconstruction Project. ATTACHMENTS: Resolution FIR