Date: September 16, 2026 To: Governing Body From: Marcos Esquibel, Interim Complete Streets Division Director Via: Sam Burnett, Public Works Director Carol Swenson, Public Works Business Operations Manager Subject: FY27 Infrastructure Preservation Funding Request ACTION: Request for Approval of a Budget Adjustment Request (BAR) in the Total Amount of $3,450,000 to Allocate ½% GRT to Complete Streets FY27 WIP Construction and Design for City-Wide Roadway Preservation, Sidewalk Repair, Pavement Condition Assessment and a Cooperative Cost-Share for Drainage Infrastructure Improvements with the Georgia O’Keefe Museum. (Marcos Esquibel, Interim Complete Streets Division Director: mpesquibel@santafenm.gov) BACKGROUND AND SUMMARY: The Public Works Department requests approval of a $3,450,000 FY27 budget adjustment to support infrastructure preservation and asset management through the Complete Streets Division. The proposed allocation includes: Roadway Preservation: $2,000,000: Implement preventive treatments, including crack sealing and fog sealing, to extend pavement life and preserve streets before deterioration requires more costly rehabilitation or reconstruction. The amount of roadway treated will depend on the treatment mix, pavement conditions, and pricing. Sidewalk Repair: $900,000: Implement sidewalk improvement projects, prioritized by safety hazards, accessibility needs, pedestrian activity, and opportunities to coordinate with other infrastructure work. Citywide Pavement Condition Assessment: $500,000: Establish consistent, network-wide pavement condition ratings to support objective project prioritization, selection of appropriate maintenance treatments, and multiyear investment planning. Assessment results will support integration with the City’s GIS and asset management systems. Drainage Infrastructure Cost Share: $50,000: Fund the City’s proposed 50% contribution toward a $100,000 storm drain inlet replacement completed by the Georgia O’Keeffe Museum. 2 Roadway preservation and sidewalk repair are ongoing annual needs that have historically relied on one-time appropriations. This approach limits the City’s ability to plan preventive maintenance and increases reliance on reactive repairs after infrastructure has deteriorated. The pavement condition assessment, which should be updated approximately every three to five years, will provide the data needed to direct funding where it can deliver the greatest long-term benefit. Approval of this BAR will fund the FY27 work and strengthen the foundation for a comprehensive transportation asset management program. These investments will improve safety and accessibility, protect existing infrastructure, and reduce future repair costs. Sustaining the roadway preservation and sidewalk repair programs will require continued funding in subsequent fiscal years. DATE JUSTIFICATION: (use additional page if needed) --Attach supporting documentation/memo Fund Balance Fund(s) Affected Increase/(Decrease) 365 (3,450,000) TOTAL: (3,450,000) Lucrecia Diaz 9/17/2026 Prepared By {print name} Date Budget Officer Date City Council Division Director Signature {optional} Date Approval Date Finance Director { $5,000} Date Agenda Item #: Department Director Signature Date City Manager { $60,000} Date Log # {Finance use only } : Journal # {Finance use only } : WIP CONSTRUCTION Georgia O'Keefe Drainage Cost Share 3650414 572970 PWD2736504-Construct Streets CIP - Capital Transfer from Capital Reserve (1/2% Capital GRT) REVENUES CITY COUNCIL APPROVAL City Council agenda items ONLY} 3,450,000$ -$ {enter as negative #} (900,000) 900,000 {enter as positive #} 600,000 50,000 {enter as negative #} 2,000,000 DEPARTMENT / DIVISION NAME INCREASE 300,000 {enter as positive #} {Use this form for Finance Committee/ 660365 Use of general capital reserve in fund 365 for roadway preservation, sidewalk repair, pavement condition idex and Georgia O'Keefe drainage problems. City of Santa Fe, New Mexico BUDGET ADJUSTMENT REQUEST (BAR) OBJECT PROJECT 9/16/2026 500,000PWD2736503-Design572960 Public Works/Complete Streets {Complete section below if BAR results in a net change to ANY Fund} 572960 PWD2510013-Design DECREASE PWD2510013-Construct572970 760330 3309980 ORG 3650414 3650414 3309980 EXPENDITURES PWD2736502-Construct572970 ITEM DESCRIPTION WIP Construction Roadway Preservation WIP Design Pavement Condition Index WIP Construction SIDEWALKS CITYWIDE WIP Design SIDEWALKS CITYWIDE Capital Reserve (1/2% Capital GRT) - Capital Transfer to Streets CIP 3309980 3650414 Signature: &..&--YVONNE SWENSON (Sep 29, 202611:18:16 MDT) Email: ycswenson@santafenm.gov GB Memo & BAR for $3.45M Final Audit Report Created: By: Status: Transaction ID: Documents: Number of Documents: 2026-09-28 Lucrecia Diaz (ldiaz@santafenm.gov) Signed CBJCHBCAABMK63_v8i8325NG00TZuqlWUDgUZE4119K FY26 GB Memo & BAR $3.45M.pdf (3 pages) Document page count: 4 Number of supporting files: 0 Supporting files page count: 0 "GB Memo & BAR for $3.45M" History ~ Document created by Lucrecia Diaz (ldiaz@santafenm.gov) 2026-09-28 - 5:02:25 PM GMT- IP address: 63.232.20.129 2026-09-30 IR.. Document emailed to YVONNE SWENSON (ycswenson@santafenm.gov) for signature 2026-09-28 - 5:03:59 PM GMT ~ Email viewed by YVONNE SWENSON (ycswenson@santafenm.gov) 2026-09-29 - 5:17:34 PM GMT- IP address: 63.232.20.129 ~ Document e-signed by YVONNE SWENSON (ycswenson@santafenm.gov) Signature Date: 2026-09-29- 5:18:16 PM GMT-Time Source: server- IP address: 63.232.20.129- Signature Appearance Selected: DRAW IR.. Document emailed to MARCOS ESQUIBEL (mpesquibel@santafenm.gov) for signature 2026-09-29- 5:18:40 PM GMT ~ Email viewed by MARCOS ESQUIBEL (mpesquibel@santafenm.gov) 2026-09-29- 5:28:14 PM GMT- IP address: 63.232.20.129 ~ Document e-signed by MARCOS ESQUIBEL (mpesquibel@santafenm.gov) Signature Date: 2026-09-29 - 5:30:02 PM GMT - Time Source: server- IP address: 63.232.20.129 - Signature Appearance Selected : IMAGE IR.. Document emailed to JOHN BURNETT Usburnett@santafenm.gov) for signature 2026-09-29 - 5:31 :17 PM GMT ~ Email viewed by JOHN BURNETT Usburnett@santafenm.gov) 2026-09-29 - 5:39:47 PM GMT- IP address: 63.232.20.129 I Poweredby Adobe Acrobat Sign 0o Document a-signed by JOHN BURNETT Usburnett@santafenm.gov) Signature Date: 2026-09-29- 5:40:17 PM GMT-Time Source: server- IP address: 63.232.20.129- Signature Appearance Selected: DRAW IR.. Document emailed to Andrew Hopkins (ajhopkins@santafenm.gov) for signature 2026-09-29 - 5:40:45 PM GMT ~ Email viewed by Andrew Hopkins (ajhopkins@santafenm.gov) 2026-09-30 - 4:10:11 PM GMT- IP address: 104.47.64.254 0o Document a-signed by Andrew Hopkins (ajhopkins@santafenm.gov) Signature Date: 2026-09-30 - 4:11 :16 PM GMT - Time Source: server- IP address: 63.232.20.2 - Signature Appearance Selected : IMAGE IR.. Document emailed to Monica Maestas (mfmaestas@santafenm.gov) for signature 2026-09-30 - 4:11 :18 PM GMT 0o Document a-signed by Monica Maestas (mfmaestas@santafenm.gov) Signature Date: 2026-09-30 - 5:08:59 PM GMT - Time Source: server- IP address: 63.232.20.2 - Signature Appearance Selected: IMAGE 9 Agreement completed. 2026-09-30 - 5:08:59 PM GMT I Poweredby Adobe Acrobat Sign