Protected Bike Lane Selection Matrix Very Good Good Neutral Poor Very Poor Scale **** *** ** * * Striped Buffer Flexible Bollards Turtle Bumps Large Bumps Oblong Low Bumps Parking Stops Linear Barrier 6" Cast in Place Barrier Curb Parked Cars Jersey Barriers Planters Rigid Bollards Cast in Place Barrier Curb Precast Barrier Curb Raised Cycle Track (Full Recon) Cost/Benefit Cost per Foot of Barrier (per side of street) *Costs double for barriers on both sides $1.50-3/ft. $8k-16k/mi. $3-5/ft. $15k-30k/mi. $2-4/ft. $10k-20k/mi. $9-18/ft. $50k-90k/mi. $12-24/ft. $60k-130k/mi. $4-8/ft. $20k-40k/mi. $4-8/ft. $20k-40k/mi. $5-15/ft. $25k-75k/mi. $15-60/ft. $80k-300k/mi. $15-30/ft. $80k-160k/mi. $15-75/ft. $80k-400k/mi. $20-40/ft. $100k-200k/mi. $20-40/ft. $100k-200k/mi. $70-115/ft. $400k-600k/mi. $1,500-5,000/ft. $8,000k-26,000k/mi. Cost **** *** *** *** *** *** *** *** ** ** ** ** ** * * Cyclist Perceived Safety * *** *** **** ** *** *** *** **** **** **** **** **** **** **** Other Considerations Durability / Maintenance ** * *** *** *** *** *** *** **** **** * *** **** *** **** Sweeping **** Depends on Width Depends on Width Depends on Width Depends on Width Depends on Width Depends on Width Depends on Width *** Depends on Width Depends on Width Depends on Width Depends on Width Depends on Width Depends on Width Trash Collection **** * **** * **** **** **** **** Depends on Time of Day * * * **** **** **** Storm Water **** *** *** *** *** ** *** *** **** ** ** *** ** ** * Traffic Compatibility (Motor vehicle / barrier interactions) **** **** ** ** *** *** *** **** *** **** *** ** **** *** **** Aesthetics (factoring in damage over time) ** * ** *** ** ** ** ** ** * **** *** *** *** *** Construction Impacts **** *** *** *** *** *** *** ** **** *** *** ** ** *** * Width Required 1.5' 1.5' 1.5' 1.5' 1.5' 1/2' 1/2' 1/2' 8' If not existing 2' 3' 2' 1' 1' 0'